Free tool
What does your debris weigh?
- 5-Star Rated
- No distance charge
- 7 days included
- Order by 3PM, next-day delivery
Quick answer
How much does a cubic yard of construction debris weigh?
A cubic yard of broken concrete weighs roughly 0.39 to 0.84 tonnes, asphalt 0.35 to 0.63, soil 0.42 to 0.93 and mixed renovation debris 0.15 to 0.38 — figures published by the United States Environmental Protection Agency, the Minnesota Pollution Control Agency and two Californian county and city authorities, all named and linked below. The ranges are wide because a cubic yard of loosely tipped rubble is not a cubic yard of tightly loaded slab. Big Bin publishes this table because disposal is billed by the tonne, so weight decides the bill.
What will your load weigh?
No address, no email, no sign-up. It runs in your browser, and the measurements you type stay there.
Work out what your load weighs
Four inches of concrete is 0.33 feet thick. Measure the space the debris will fill, not the slab it came from — broken concrete does not stack the way it was poured.
3.9 cubic yards of broken concrete
1.5 – 3.3 t
This is an estimate, not a measurement. Published densities disagree, and real material varies with moisture, how tightly it is packed, and what else is mixed into it.
That volume fits a 14 yard bin.
Heavy material
This is a weight problem before it is a space problem. A bin can be inside its volume and still be too heavy to leave your driveway legally, so the size above is the room it needs — not a promise that it can be hauled full.
What a cubic yard of each material weighs
Weight per cubic yard as the material sits loose in a bin. Where two agencies publish different figures, both are here — the disagreement is real and it is worth understanding, because it is the difference between rubble tipped loose into a mixed load and a bin packed with one material.
| Material | Pounds per cubic yard | Tonnes per cubic yard | Published by |
|---|---|---|---|
| Broken concreteSlab, footing and foundation concrete, with or without reinforcing bar. The low number is concrete mixed in with other waste; the high number is a bin of concrete and nothing else, like the broken-up slab of a concrete driveway. | 860 – 1,855 | 0.39 – 0.84 | United States Environmental Protection Agency, Office of Resource Conservation and Recovery, April 2016 · City of Woodland, California, no publication date printed; retrieved 2026-08-11 |
| Concrete mixed with soilMeasured, not estimated: the middle half of 75 real truckloads of concrete and dirt, weighed at a disposal site. | 987.3 – 1,814 | 0.45 – 0.82 | Minnesota Pollution Control Agency, September 2021 · Minnesota Pollution Control Agency, September 2021 |
| Broken asphaltDriveway and road surface, broken out. Lighter than concrete for the same volume because it is stone chippings held together, not one solid mass. | 773 – 1,380 | 0.35 – 0.63 | United States Environmental Protection Agency, Office of Resource Conservation and Recovery, April 2016 · City of Woodland, California, no publication date printed; retrieved 2026-08-11 |
| BrickWhole brick. It is very heavy for its size: half a cubic yard of brick weighs more than a whole cubic yard of most other waste. The only published number we found for it comes from an undated chart by the City of Woodland, California. | 3,024 | 1.37 | City of Woodland, California, no publication date printed; retrieved 2026-08-11 |
| Soil, dirt and clean fillDug-up earth. Wet soil weighs more than dry soil, so the same pile is heavier after rain. Only a scale can tell you exactly. | 929 – 2,052 | 0.42 – 0.93 | United States Environmental Protection Agency, Office of Resource Conservation and Recovery, April 2016 · City of Woodland, California, no publication date printed; retrieved 2026-08-11 |
| Rock and gravelStone, gravel and rubble aggregate. | 999 – 2,570 | 0.45 – 1.17 | United States Environmental Protection Agency, Office of Resource Conservation and Recovery, April 2016 · City of Woodland, California, no publication date printed; retrieved 2026-08-11 |
| Mixed renovation debrisThe ordinary contents of a renovation bin: wood, drywall, cabinets, flooring, packaging. Measured across 556 weighed truckloads, and two other agencies land inside this range — 417 lbs per cubic yard from the EPA and 484 from a Florida study of 171 weighed loads. | 323 – 838.2 | 0.15 – 0.38 | Minnesota Pollution Control Agency, September 2021 · Minnesota Pollution Control Agency, September 2021 |
| Demolition debrisKnocking down a whole building, not just stripping out a room. Measured across 289 weighed truckloads. | 332 – 676.8 | 0.15 – 0.31 | Minnesota Pollution Control Agency, September 2021 · Minnesota Pollution Control Agency, September 2021 |
| Drywall and gypsum boardClean or painted gypsum board. Even one sheet in a bin of only concrete means the bin is not taken away. | 467 | 0.21 | United States Environmental Protection Agency, Office of Resource Conservation and Recovery, April 2016 |
| Clean lumberLumber, offcuts and framing. Light for its size, which is why a bin of it almost never runs into a weight problem. | 169 | 0.08 | United States Environmental Protection Agency, Office of Resource Conservation and Recovery, April 2016 |
| Asphalt roof shinglesTear-off shingles. Heavier than most renovation debris and easy to underestimate, because a roof looks like a surface rather than a volume. | 731 | 0.33 | United States Environmental Protection Agency, Office of Resource Conservation and Recovery, April 2016 |
One tonne is 2,204.62 pounds. These are third-party figures reproduced with their sources, not Big Bin measurements. If you know of a Canadian federal or Ontario source that publishes the same thing, tell us and it goes on this page — Canadian agencies publish a great deal about waste diversion and almost nothing about what a cubic yard of it weighs.
What our customers say
From our Google Business Profile, read on 2026-09-16
I would like to shout out these guys! Finding a waste disposal company that handles heavy materials like concrete without a bunch of hidden fees or headaches is usually very difficult but Big Bin made the process very easy. Pricing was great and the team was very professional. I would genuinely recommend them for any big project!
Ayman Khaled On time, quick and easy to communicate with, and great service all around
Eldin Malkic Amazing work ! Very good time that takes good care of you !
Evgeny Litvinenko
What a full bin of each material weighs
The table above is per cubic yard, which is how the agencies publish it. Here it is multiplied out against the three sizes Big Bin runs. “What does a bin of this weigh” is the question people actually have. A range means the sources disagree, and both ends are theirs.
| Material | 14 yard bin | 30 yard bin | 40 yard bin |
|---|---|---|---|
| Broken concrete | 5.5 – 11.8 t | 11.7 – 25.2 t | 15.6 – 33.7 t |
| Concrete mixed with soil | 6.3 – 11.5 t | 13.4 – 24.7 t | 17.9 – 32.9 t |
| Broken asphalt | 4.9 – 8.8 t | 10.5 – 18.8 t | 14 – 25 t |
| Brick | 19.2 t | 41.1 t | 54.9 t |
| Soil, dirt and clean fill | 5.9 – 13 t | 12.6 – 27.9 t | 16.9 – 37.2 t |
| Rock and gravel | 6.3 – 16.3 t | 13.6 – 35 t | 18.1 – 46.6 t |
| Mixed renovation debris | 2.1 – 5.3 t | 4.4 – 11.4 t | 5.9 – 15.2 t |
| Demolition debris | 2.1 – 4.3 t | 4.5 – 9.2 t | 6 – 12.3 t |
| Drywall and gypsum board | 3 t | 6.4 t | 8.5 t |
| Clean lumber | 1.1 t | 2.3 t | 3.1 t |
| Asphalt roof shingles | 4.6 t | 9.9 t | 13.3 t |
For what these figures mean on a specific job: What can go in a bin, Bin and dumpster rental cost, Bin & Dumpster Rental in Toronto, Bin & Dumpster Rental in Burlington, Bin & Dumpster Rental in Hamilton, Bin & Dumpster Rental in Milton, Bin & Dumpster Rental in Caledon, Concrete disposal, Roll-off bins explained, Bin & Dumpster Rental in Mississauga, Bin & Dumpster Rental in Brampton, Bin & Dumpster Rental in Oakville, Bin & Dumpster Rental in Whitby, Bin & Dumpster Rental in Oshawa, Bin & Dumpster Rental in Pickering, Bin & Dumpster Rental in Ajax, Bin & Dumpster Rental in Markham, Bin & Dumpster Rental in Vaughan, Bin & Dumpster Rental in Richmond Hill, Bin & Dumpster Rental in Aurora, Bin & Dumpster Rental in Newmarket, 40 Yard Bin & Dumpster Rental, Oshawa dump: hours, fees and what it takes, Bin & Dumpster Rental in North York, Bin & Dumpster Rental in Etobicoke, Bin & Dumpster Rental in Scarborough, Bin & Dumpster Rental in Georgetown and Bin & Dumpster Rental in Orangeville.
Filled level and loose, which is not how a real bin gets loaded. Treat these as the shape of the answer rather than a measurement. Several combinations here weigh more than a truck may legally carry on an Ontario road. That ceiling belongs to the loaded vehicle rather than the container, and where a load falls against it depends on the truck’s axle configuration and its own empty weight. Big Bin paints a fill line eighteen inches below the rails of every container — 31" off the floor of the 14 yard, 46" in the 30 and 66" in the 40 — but that is a rule about what can be secured for the road, not a tonnage, and on the heavy rows here the legal ceiling arrives first.
Why weight decides the bill
A disposal facility weighs the truck when it arrives, weighs it again after it tips, and bills the difference by the tonne. That is the one cost in a bin rental nobody can predict in advance, because the customer decides it after the price has been quoted.
It is also why the same steel box costs wildly different amounts to empty. A 14 yard bin of mixed renovation debris weighs somewhere around 2 to 5 tonnes. The same bin filled with broken concrete is 5 to 12. Nothing about the bin changed.
So knowing what your debris weighs before you fill the bin is what stops the final invoice being a surprise. It is also how you tell whether the size that fits the volume is the size to order.
The limit that is not about the bin
There is a point where a load stops being a question of what fits and becomes a question of what a truck may legally carry. Ontario sets weight limits by axle configuration under the Highway Traffic Act and O. Reg. 413/05, and the Ministry of Transportation requires a permit above them.
For heavy material that ceiling arrives long before the bin is full. Run the numbers on this page: 14 cubic yards of broken concrete is somewhere between 5 and 12 tonnes, and a roll-off truck is carrying its own considerable weight before any of that goes on. That is why heavy material goes in a small bin: it is the axle limit on the loaded truck doing the deciding, not the size of the container.
- O. Reg. 413/05: Vehicle Weights and Dimensions — For Safe, Productive and Infrastructure-Friendly Vehicles — Government of Ontario, no publication date printed; retrieved 2026-08-11
- Guide to oversize/overweight vehicles and loads — Ontario Ministry of Transportation, 2 July 2025
Sources
Every figure above, and where it came from. Two of these are primary measurements — trucks put on a scale — and the rest are agency conversion tables. Where a document carries no publication date, this page says so rather than passing off the date we retrieved it as the date it was written.
Volume-to-Weight Conversion Factors
United States Environmental Protection Agency, Office of Resource Conservation and Recovery — April 2016
A revision of the conversion factors in the EPA’s 1997 report “Measuring Recycling: A Guide for State and Local Governments”, drawing on state agency and academic studies rather than new measurement. Its construction-and-demolition figures come from a 2006 California Integrated Waste Management Board characterisation study and a Florida study scaled by the University of Florida.
Volume-to-Weight Conversions (document w-sw2-08)
Minnesota Pollution Control Agency — September 2021
Primary measurement. Loaded trucks were weighed on the scale as they arrived at a construction and demolition facility between February and May 2021, and each load was categorised by its main material: 556 mixed construction and demolition loads, 75 concrete-and-dirt loads, and 289 demolition loads. The figures below are that study’s quartiles, so they describe the middle half of real loads rather than an average that hides the spread.
City of Woodland, California — no publication date printed; retrieved 2026-08-11
A conversion chart published by the city for contractors calculating a project’s diversion rate. The document names no source for its figures and carries no publication date, which is why it is used here only alongside a dated source and never on its own.
Quote any of these figures freely — cite the agency named on the row rather than this page, because the figures are theirs.
Reviewed October 2026Kenan Sljoka
Common questions
How much does a cubic yard of broken concrete weigh?
Published figures from public agencies run from 860 pounds per cubic yard to about 1,855 pounds per cubic yard — roughly 0.39 to 0.84 tonnes. The spread is real, not sloppiness: a cubic yard of loosely tipped rubble in a mixed load weighs far less than a cubic yard of tightly loaded slab pieces. Both ends of that range are named and linked on this page.
Why does the weight of a load matter more than its size?
Because disposal facilities charge by the tonne, not by the cubic yard. Two identical bins, one full of renovation debris and one full of broken concrete, can differ by five times in weight and therefore in disposal cost. Weight is also what decides whether a truck can legally carry the load on an Ontario road.
Is this estimator a quote?
No. It estimates a weight from published density figures, and densities move with moisture, compaction and contamination. It does not price a job, it does not book anything, and it does not commit Big Bin to accepting a load. Use it to work out roughly what you are dealing with, then call.
Do I have to give an email address to use it?
No. The estimator is on the page, it runs in your browser, and it asks for nothing. There is no email gate, no address and no sign-up.
How much does a cubic yard of soil or dirt weigh?
Published figures run from 929 pounds per cubic yard to 2,052 — roughly 0.42 to 0.93 tonnes. The lower figure is the United States Environmental Protection Agency’s. The higher one comes from a Californian city conversion chart. Both are named and linked in the table above. Moisture moves this row further than any other material on the page: the same soil after three days of rain can be a third heavier. Nothing on a website can tell you which of the two you have.
How much does a cubic yard of gravel weigh?
Rock and gravel run from 999 pounds per cubic yard to 2,570 — roughly 0.45 to 1.17 tonnes. The spread is real rather than sloppiness. Loose gravel tipped into a bin does not pack like graded stone, and the two agencies were measuring material in different states. Both ends are in the table above, with the agency that published each one.
How many tonnes does a 40 yard bin of concrete hold?
On the published figures, 40 cubic yards of broken concrete is roughly 15.6 to 33.7 tonnes. The by-bin-size table on this page works the same arithmetic out for every material. That is well past the point where the loaded truck’s weight becomes the binding limit rather than the container’s volume. Where exactly it falls depends on the truck’s axle configuration and its own empty weight. It is the reason the size that fits the volume is not always the size that can be hauled.
What is the heaviest material that goes in a bin?
Whole brick, at 3,024 pounds per cubic yard — about 1.37 tonnes for one cubic yard, heavier than any other row in the table above. It is also the row to treat with most caution. Only one public figure could be sourced for it, and that document carries no publication date. The practical consequence catches people out: half a cubic yard of brick weighs more than a whole cubic yard of most other debris.
Why are the weight figures on this page from American agencies?
Because we could not find a Canadian equivalent. Searching on 2026-08-18 across ontario.ca, canada.ca, Statistics Canada and municipal publications turned up no Canadian federal or provincial source for it. A cubic yard of concrete does not weigh less in Ontario than in Minnesota, so the figures transfer. What does not transfer is the law: the Ontario weight rules linked further down this page are what governs a truck here. If you know of a Canadian source, tell us and it goes on the page.
Does rain make a load heavier?
Yes, and soil is where it shows most. The figures in the table above are for material as it sits loose in a bin. Moisture moves the soil row further than any other: the same soil after three days of rain can be a third heavier. It matters because disposal is billed by the tonne. A load that sat open through a wet week costs more to tip than the same volume did dry.
Also on this site
Service
Roll-off bin rentalPage
Get a quotePage
Bin rental pricesPage
About Big BinPage
Contact Big BinPage
Bin rental for contractorsPage
GuidesLegal
Privacy policy
